Internal demolition activities normally follow on from the strip-out process, and can include the removal of temporary building, extensions, slab floors and ceilings, non-load bearing and load bearing partitions, mechanical and electrical (M&E) systems including lighting, cables, cable trays, heating, ventilation systems etc.
No matter how big or small the demolition project, we always dedicate the same amount of thorough planning to select the correct access, tooling and machinery required to undertake the works with 100% safety and efficiency.
We are constantly looking for ways to reduce exposure to HAV, noise and dust emissions and have an excellent health and safety record.